[ 212 W 93 Street ]

A residential development where façade and interior detailing met precise engineering coordination.

I was involved on the preconstruction phase, my contribution was oversee shop drawings of both facade and interior elements such as tempered glass walkway Propose materials Propose technical and engineering details.

shop drawings, samples and submittals, fabrication installation plan, sub contractors overview, schedules, etc.

New York City
CMG-APM

architect:
Giraldo AEC
project type:
Residential Development
Role:
Preconstruction & Technical Design Oversight
LOCATION:
New York City